Skip to content
EnMonterrey
Manufacturing · Automotive

Kia puts $649M into Pesqueria to build the EV3 in Nuevo Leon

Kia says it will expand and retool its Pesqueria plant to assemble the fully electric EV3 starting Aug. 4, turning Nuevo Leon into the first production base outside Korea for this model.

Illustration for: Kia puts $649M into Pesqueria to build the EV3 in Nuevo Leon

Kia announced a US $649 million investment to expand and adapt its manufacturing facility in Pesqueria, Nuevo Leon, to assemble the electric Kia EV3 starting Aug. 4, 2026.

The package is framed as part of Mexico’s industrial policy push (Plan México). For Nuevo Leon operators, the practical question is how quickly local suppliers can ramp content from an initial ~27% and what new energy and utilities loads the upgraded line will require.

Why it matters

An EV program anchored in Pesqueria tends to pull in tooling, plastics, electronics and logistics work across the Monterrey corridor. The announced job ramp (500 in 2026 plus 1,500 more through 2030) is modest on day one, but it’s the supplier pipeline that usually drives the bigger second-order employment.

What to watch

Watch for supplier localization announcements tied to EV3 components, and for updates on the site’s sustainability add-ons (solar and water recycling) as the line starts up in early August.

  • Where: Pesqueria, Nuevo Leon (Kia plant)
  • Capex: US $649M (2026–2028)
  • Start date: Aug. 4, 2026 (EV3 assembly)
  • Jobs: 500 in 2026; +1,500 direct jobs 2027–2030
  • Local content: ~27% initially
Go deeper

Sources · 3 sources

The primary reporting behind this brief. Open in a new tab.

  1. Mexico News Dailymexiconewsdaily.com
  2. Infobae Méxicoinfobae.com
  3. El Cronistacronista.com