Skip to content
EnMonterrey
The record

Archive · Page 5

Older briefings, page 5 of 6. Grouped by month, newest first. Nothing here is behind a paywall — this is a public record of what moved the Monterrey business ecosystem.

165 stories · Showing 121–150

August 2026

  1. Nuevo León Draws US$3.7B in First-Half Foreign Investment
    Investment · Foreign Direct InvestmentAug 25

    Nuevo León Draws US$3.7B in First-Half Foreign Investment

    Nuevo León ranked second among Mexican states for foreign direct investment in the first half, even as the national record leaned heavily on reinvestment by companies already operating here.

  2. Nuevo León Reports $135B in Investment; Federal Counts Differ
    Investment · Nuevo LeónAug 23

    Nuevo León Reports $135B in Investment; Federal Counts Differ

    The state’s latest investment tally is large, useful context for operators, and worth reading with the measurement caveat that comes from the federal comparison.

  3. Jose J. Ruiz Publishes AI in the Org Chart, a Field Guide for Executives
    Books · LeadershipAug 22

    Jose J. Ruiz Publishes AI in the Org Chart, a Field Guide for Executives

    The new book from Alder Koten's CEO argues that keeping a person in the loop is not the same as keeping judgment in the loop, and gives leaders a framework for redesigning who owns what once AI enters the workflow.

  4. Nuevo León’s Ponte Nuevo Drive Reaches About Ps. 500M
    Policy · Business PartnershipAug 22

    Nuevo León’s Ponte Nuevo Drive Reaches About Ps. 500M

    A state-backed partnership is being formalized after 90 companies pooled roughly Ps. 500 million for security, water, mobility and public-space projects.

  5. Volvo Starts Truck Exports From Nuevo León Through Colombia-Laredo
    Manufacturing · Cross-Border TradeAug 21

    Volvo Starts Truck Exports From Nuevo León Through Colombia-Laredo

    Volvo’s Ciénega de Flores plant has begun sending its first heavy trucks into the North American supply chain through Nuevo León’s Colombia-Laredo crossing.

  6. Atera Brings a $500M Self-Generation Plan to Nuevo León
    Energy · Industrial PowerAug 20

    Atera Brings a $500M Self-Generation Plan to Nuevo León

    Atera is entering Mexico with a multi-year self-generation push; Nuevo León is one of the manufacturing states the company names as it looks to ease power constraints without upfront plant capex.

  7. Nuevo León and CFE Commit 10 Billion Pesos to Strengthen Grid
    Energy · InfrastructureAug 19

    Nuevo León and CFE Commit 10 Billion Pesos to Strengthen Grid

    A joint Nuevo León–CFE package targets transmission, distribution and mobile stations after a summer of outages that also disrupted water pumping in García.

  8. Bosch Opens $300M Home Comfort Plant in Ciénega de Flores
    Manufacturing · Home ComfortAug 19

    Bosch Opens $300M Home Comfort Plant in Ciénega de Flores

    Bosch has inaugurated its new air-conditioning facility in Ciénega de Flores, adding 900 jobs and another anchor to Nuevo León’s appliance manufacturing base.

  9. Bupa Plans Ps. 100M Monterrey Expansion Over Five Years
    Corporate · Health ServicesAug 17

    Bupa Plans Ps. 100M Monterrey Expansion Over Five Years

    New offices in San Pedro anchor Bupa México’s five-year regional plan, as the insurer says Monterrey has become a larger share of its northern growth story.

  10. KIO Plans More Than $200M Across Mexico, Including Monterrey
    Technology · Data CentersAug 17

    KIO Plans More Than $200M Across Mexico, Including Monterrey

    KIO’s 2026 expansion plan names Monterrey alongside Mexico City and Querétaro, offering a fresh signal for the region’s digital-infrastructure ecosystem without a city-level figure yet.

  11. Kia's Pesquería Plant Is on Track to Build 300,000 Cars in 2026
    Manufacturing · AutomotiveAug 16

    Kia's Pesquería Plant Is on Track to Build 300,000 Cars in 2026

    A new production milestone is coming into view in Pesquería as Kia adds the EV3 to a plant already reaching more export markets.

  12. Nuevo León’s Manufacturing Sector Adds 26,268 Jobs Through July
    Labor · ManufacturingAug 15

    Nuevo León’s Manufacturing Sector Adds 26,268 Jobs Through July

    Manufacturing supplied roughly two-thirds of Nuevo León’s formal job growth through July, a useful read on where the state’s industrial momentum is showing up first.

  13. Nuevo León Booked $5.6B in Announced Investment Through July, Leading the Country
    Economy · InvestmentAug 14

    Nuevo León Booked $5.6B in Announced Investment Through July, Leading the Country

    State officials say 7,620 new jobs are tied to the pipeline. It's 12% of every announced-investment dollar in Mexico this year, a bigger share than the state's population would suggest.

  14. Nuevo León Firms Turn to Staggered Schedules as Traffic Builds
    Infrastructure · MobilityAug 12

    Nuevo León Firms Turn to Staggered Schedules as Traffic Builds

    Caintra says eight in 10 surveyed companies now use a mobility measure, from staggered hours to carpooling, as Monterrey’s commute remains a business issue.

  15. Nuevo León Auto Exports Rise 6.6% Through July
    Manufacturing · AutomotiveAug 12

    Nuevo León Auto Exports Rise 6.6% Through July

    Nuevo León’s vehicle plants shipped 153,661 units abroad in the first seven months, while July exports and production both accelerated year over year.

  16. Power Failure Leaves Industrial Parks Without Water in Monterrey’s West
    Infrastructure · UtilitiesAug 11

    Power Failure Leaves Industrial Parks Without Water in Monterrey’s West

    A power failure at the Buenos Aires well system disrupted pumping in La Huasteca, affecting residents and industrial parks in Santa Catarina and García while CFE works to restore the network.

  17. Nuevo León’s Emissions Inventory Moves Toward August Release
    Policy · Air QualityAug 10

    Nuevo León’s Emissions Inventory Moves Toward August Release

    The state says the long-awaited metropolitan emissions inventory is in final adjustments, with a public presentation expected in the coming weeks and implications for industrial operators.

  18. Nuevo León Puts Ps. 1B for Schools Through December
    Policy · Education InfrastructureAug 9

    Nuevo León Puts Ps. 1B for Schools Through December

    The state says a second Ps. 1 billion envelope will fund new schools and classrooms through December, while 334 campuses receive maintenance and 110 get infrastructure work.

  19. SpaceX and Tesla put $16.8B into a Texas chip fab — and Nuevo León is standing at the door
    Cross-border · SemiconductorsAug 8

    SpaceX and Tesla put $16.8B into a Texas chip fab — and Nuevo León is standing at the door

    The 100-million-square-foot Terafab in Grimes County will consolidate logic, memory and packaging under one roof. For Nuevo León, the interesting question is which pieces of the chain it can catch on the Mexican side.

  20. Nuevo León Gas Basin Stays Under Mexico’s Fracking Review
    Energy · PolicyAug 8

    Nuevo León Gas Basin Stays Under Mexico’s Fracking Review

    A federal expert panel recommends a ban in one basin but keeps two northern areas under evaluation, including a gas province that spans Nuevo León and Coahuila.

  21. San Pedro’s Ps. 220M CITEA Project Targets September Finish
    Construction · San PedroAug 8

    San Pedro’s Ps. 220M CITEA Project Targets September Finish

    A Ps. 220 million civic build in San Pedro is taking shape as a new autism intervention and public-school campus, with completion targeted for late September.

  22. Nuevo León Manufacturers Top US$20B in First-Quarter Exports
    Trade · ManufacturingAug 6

    Nuevo León Manufacturers Top US$20B in First-Quarter Exports

    Index Nuevo León says export manufacturing cleared US$20 billion in Q1, while local sourcing is beginning to replace Asian inputs across the sectors that feed Monterrey’s cross-border engine.

  23. AI Data Centers Push Nuevo León Cooling Makers to Expand
    Technology · Data CentersAug 6

    AI Data Centers Push Nuevo León Cooling Makers to Expand

    Nuevo León's cooling-equipment makers say AI and data-center demand has their capacity spoken for, turning a familiar appliance cluster into an infrastructure story with a Monterrey date on the calendar.

  24. Fibra Mty closes a $24.1M Guanajuato industrial deal
    Real Estate · IndustrialAug 5

    Fibra Mty closes a $24.1M Guanajuato industrial deal

    The Monterrey-based real estate trust has added a fully leased Class A warehouse in the Bajío, putting fresh capital behind Mexico’s manufacturing corridor.

  25. Whirlpool to Wind Down Apodaca Operations by Late 2027
    Manufacturing · Industrial Real EstateAug 4

    Whirlpool to Wind Down Apodaca Operations by Late 2027

    Whirlpool plans to move production from its Apodaca operation to Ramos Arizpe and other plants, while Fibra Monterrey starts planning for the space beyond the transition.

  26. Monterrey Airport Paused Flights for Nearly an Hour in Storm
    Logistics · AviationAug 3

    Monterrey Airport Paused Flights for Nearly an Hour in Storm

    A thunderstorm interrupted takeoffs and landings at Monterrey International Airport on Sunday afternoon. The short pause is a useful reminder that weather remains an operating variable for the region’s air gateway.

  27. Nemak Raises Ps. 7.4B in Monterrey Debt Refinance
    Finance · Corporate DebtAug 2

    Nemak Raises Ps. 7.4B in Monterrey Debt Refinance

    The Monterrey auto-parts maker placed two local-note tranches, with proceeds earmarked to refinance existing liabilities and settlement expected on August 4.

  28. Nuevo León Economy Grew 1.4% in Q1, Three Times National Pace
    Economy · ITAEEAug 2

    Nuevo León Economy Grew 1.4% in Q1, Three Times National Pace

    The first-quarter read is a steady signal rather than a victory lap: Nuevo León outpaced Mexico overall, with construction and commerce helping carry the state’s business ecosystem.

July 2026

  1. Kia puts $649M into Pesqueria to build the EV3 in Nuevo Leon
    Manufacturing · AutomotiveJul 31

    Kia puts $649M into Pesqueria to build the EV3 in Nuevo Leon

    Kia says it will expand and retool its Pesqueria plant to assemble the fully electric EV3 starting Aug. 4, turning Nuevo Leon into the first production base outside Korea for this model.

  2. Kia confirms US$649M for EV3 at Pesquería — production starts August 4
    AUTOMOTIVE · EVJul 30

    Kia confirms US$649M for EV3 at Pesquería — production starts August 4

    President Sheinbaum, Marcelo Ebrard, and Kia México's Andy Kim used the daily mañanera to make the Pesquería EV line official. It's the first fully electric vehicle assembled in Mexico, retooling the existing plant rather than building a mirror complex. Batteries next.