Skip to content
EnMonterrey
The record

Archive · Page 6

Older briefings, page 6 of 6. Grouped by month, newest first. Nothing here is behind a paywall — this is a public record of what moved the Monterrey business ecosystem.

165 stories · Showing 151–165

July 2026

  1. Chipotle’s Mexico debut lands in San Pedro — with Alsea running ops
    Consumer · RetailJul 28

    Chipotle’s Mexico debut lands in San Pedro — with Alsea running ops

    Chipotle’s first Mexico restaurant opened in San Pedro Garza García, adding another U.S. brand launch to the Monterrey metro’s playbook — and putting Alsea’s “next 20 years” expansion narrative in the spotlight.

  2. Bachoco puts 31m pesos into cleaner operations in Salinas Victoria
    Industry · SustainabilityJul 28

    Bachoco puts 31m pesos into cleaner operations in Salinas Victoria

    Bachoco is upgrading its Monterrey-area feed plant with dust controls, filtration and a switch toward natural gas — a small but concrete signal of where compliance capex is flowing in Nuevo León.

  3. CFE and Cubico sign $1 billion renewable deal spanning Nuevo León
    Energy · RenewablesJul 27

    CFE and Cubico sign $1 billion renewable deal spanning Nuevo León

    A new 25-year joint venture will build 578 MW of solar and wind plus battery storage across five states including Nuevo León — part of a bigger bet on keeping the region's grid ahead of its data-center boom.

  4. Banorte profit rises 6% to $889 million as loan demand holds up
    Earnings · Financial ServicesJul 27

    Banorte profit rises 6% to $889 million as loan demand holds up

    Grupo Financiero Banorte, based in San Pedro Garza García, posted a strong quarter on consumer loan growth even as it flagged that USMCA uncertainty is shortening corporate credit terms.

  5. CEMEX posts record $1.02 billion EBITDA, raises 2026 outlook
    Earnings · Building MaterialsJul 27

    CEMEX posts record $1.02 billion EBITDA, raises 2026 outlook

    The Monterrey-HQ'd cement giant beat estimates with a 24% EBITDA jump and now expects full-year growth of up to 17%, powered by cost cuts and a European settlement.

  6. Alder Koten at Farnborough 2026: what Silvia Flores and Jose Ruiz saw on the ground
    Aerospace · From the showJul 25

    Alder Koten at Farnborough 2026: what Silvia Flores and Jose Ruiz saw on the ground

    The IMD International Search Group's Aerospace Practice was on the tarmac in Hampshire this week. Two of its senior operators — Silvia Flores in Monterrey and Jose Ruiz in Houston — describe the quiet conversations that don't make the headlines: how program transfers into Mexico are being staffed, what a technical VP looks like when a line moves from a US or European plant into the Bajío, and which Mexican aerospace announcements from the show floor actually change the leadership map.

  7. Nuevo León led Mexico in H1 investment announcements — US$5.58 billion, one in eight dollars
    Investment · H1 2026Jul 25

    Nuevo León led Mexico in H1 investment announcements — US$5.58 billion, one in eight dollars

    The Ministry of Economy's semester tally is in: US$46.96B announced nationwide, and Nuevo León took 12% of it. The projects are pointed at advanced manufacturing, electromobility, logistics, and energy — with 6,120 direct jobs attached. What's less obvious in the headline: the state's ability to keep converting announcements into ground-broken sites is what will decide whether this ranking holds through H2.

  8. Kia adds US$600M to its Pesquería plant — the biggest single EV bet of H1
    Automotive · EVJul 25

    Kia adds US$600M to its Pesquería plant — the biggest single EV bet of H1

    New EV assembly lines, energy infrastructure upgrades, and a water-efficiency retrofit for the Korean automaker's Pesquería complex. Three hundred direct jobs in the announcement — but the read-through is the Tier-1 Korean supplier network that Kia's expansion pulls in behind it.

  9. Equinix opens MO2 in Apodaca — US$250M, second site in the state
    Data CentersJul 25

    Equinix opens MO2 in Apodaca — US$250M, second site in the state

    The company's second Nuevo León data center is live in Nexxus Aeropuerto with 30,000+ sq ft of colocation space. Phased expansion continues through 2030.

  10. Naturgy commits €300M through 2030 to expand NL gas network
    EnergyJul 25

    Naturgy commits €300M through 2030 to expand NL gas network

    Announced after a sit-down between Naturgy's Reynés and Governor García. The distribution buildout is designed to serve the industrial load that the announcements pipeline is about to bring online.

  11. Industrial absorption jumped 125% in Q2 to 295,000 m² — Apodaca and Santa Catarina led new supply
    Real Estate · CBREJul 25

    Industrial absorption jumped 125% in Q2 to 295,000 m² — Apodaca and Santa Catarina led new supply

    CBRE's Q2 read: manufacturing took 78% of the leased space; US, Danish, and German capital led demand; Asian tenants added 74,000 m² on their own. Inventory now sits at 17.99 M m².

  12. Mercado Libre takes 70,000 m² at Areya Escobedo — Panasonic follows
    LogisticsJul 25

    Mercado Libre takes 70,000 m² at Areya Escobedo — Panasonic follows

    Escobedo just added its biggest logistics tenant of the year. The site opens in September; the municipal government is running a 2,000-person job fair to staff it. Building 2, already under construction, is earmarked for Panasonic.

  13. Nuevo León and AI-GDC unveil US$1B Nvidia-powered HPC center
    AI · InfrastructureJul 25

    Nuevo León and AI-GDC unveil US$1B Nvidia-powered HPC center

    Governor García announced the state's first HPC/AI facility at Mexico AI+. Phased build 2026–2030.

  14. Saint-Gobain commits US$850M to Santa Catarina and Apodaca
    ManufacturingJul 25

    Saint-Gobain commits US$850M to Santa Catarina and Apodaca

    One of the largest single-plant checks of the H1 cycle from a French building-materials supplier.

  15. Vesta launches Vesta Park Monterrey under Ruta 2030 (US$1.7B plan)
    Industrial REJul 25

    Vesta launches Vesta Park Monterrey under Ruta 2030 (US$1.7B plan)

    The industrial REIT confirmed "significant" infrastructure investment in Monterrey, Guadalajara and Ciudad Juárez in H2, backed by a US$300M capital raise.